Predictive maintenance compared to other maintenance concepts

 
Reactive maintenance
    Advantage:
  • "Run until failure" - this concept reduces maintenance costs on equipment - until the equipment fails.
    Disadvantage:
  • Increased costs due to unplanned downtime of equipment
  • Increased labour costs especially if overtime is needed.
Preventive maintenance
    Advantage:
  • Scheduled maintenance intervals reduce machine downtime (failure rate).
  • Compared to reactive maintenance this can result in cost savings of approx. 12%.
    Disadvantage:
  • Maintenance based on a time schedule leads to high labour costs and expensive part replacements since components with remaining lifetime might also be replaced.
  • Unplanned downtime cannot be excluded.
Predictive maintenance or condition monitoring
    Advantage:
  • Continuous monitoring detects the onset of component problems in advance.
  • Maintenance is only performed when needed and can be planned in time.
  • This can result in cost savings of another approx. 18% as compared to preventive maintenance.
  • Costs for machine and process downtime are reduced.
  • Costs for manpower and replacement parts are reduced.
    Disadvantage:
  • The initial costs for standard monitoring systems such as thermography and vibration analysis can be very high.